Vol-2A App-F Landfill-Closure-Management-Plan

Chapter: Vol 1A Chapter 06 Construction work

Previous appendix: Vol 2A App D Properties affected by acquisition

Appendix Vol 2A App F Landfill Closure Management Plan

Hi-res pdf: New M5 EIS Vol 2A App F Landfill Closure Management Plan.pdf

Low-res pdfs:

Section Pages
1.0 Introduction 1
1.1 Background 1
1.2 Objective 2
1.3 Purpose and scope 2
1.4 Relevant guidelines 3
1.5 Consultation 3
2.0 Site description 5
3.0 Site history 7
4.0 Site conditions and surrounding environment 11
5.0 Existing site features, monitoring and management 13
5.1 Landfill cap 13
5.2 Leachate management system 13
5.2.1 Existing leachate management system 13
5.2.2 Leachate characterisation 13
5.3 Leachate treatment plant 15
5.4 Surface water and stormwater management system 15
5.5 Groundwater management 16
5.5.1 Groundwater management system and monitoring network 16
5.5.2 Groundwater quality 17
5.6 Landfill gas and air monitoring 18
5.6.1 Landfill gas management system 18
5.6.2 Landfill gas characterisation 19
5.7 Existing monitoring and management requirements 23
6.0 Proposed final landform and land use 25
6.1 Final landform 25
6.2 Final land use 26
7.0 Landfill closure and rehabilitation 27
7.1 Closure and stabilisation of the landfill 27
8.0 Site closure – Key components 29
8.1 Final landfill cap design 29
8.1.1 Growing media establishment following installation of cap 30
8.1.2 Revegetation 30
8.2 Landfill gas management 31
8.3 Landfill Fire Management 31
8.4 Leachate drainage layer 32
8.5 Leachate management 33
8.5.1 Leachate treatment plant 33
8.5.2 Stormwater and leachate pump station 33
8.6 Surface water drainage management 34
8.7 Asbestos management 34
9.0 Proposed management and monitoring 35
9.1 Landfill closure phase monitoring and management requirements 35
9.2 Post closure phase monitoring and management requirements 47
10.0 Operational responsibilities and reporting requirements 49
10.1 Operational responsibilities 49
10.2 Reporting frequency 50
11.0 Closure phase communications and reporting 51
11.1 Communications protocols 51
11.2 Environmental audit schedule 51
11.3 Annual document review 51
12.0 Certified Statement of Completion 53
13.0 References 55
Appendix A Figures and Design Drawings A
Appendix B SEARs B
Appendix C Existing EPLs and TWA C
Appendix D Technical Memos and Diagrams D
Appendix E Asbestos Management Plan E
Appendix F Proposed Groundwater and Leachate Monitoring Plan F
Appendix G Proposed Leachate Extraction Management Plan G
Appendix H Proposed Landfill Gas Extraction Management Plan H
Advertisements

One thought on “Vol-2A App-F Landfill-Closure-Management-Plan

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s